Where to expect traffic delays in the days ahead
 A4020 Uxbridge Road
      06 August — 09 August Delays likely Traffic control (two-way signals) 
      Works description: SEWER CLEANING - REACTIVE 
      Responsibility for works: THAMES WATER 
      Current status: Planned work about to start 
Du Cane Road
       06 August — 07 August Delays likely Traffic control (two-way signals) 
      Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE 
      Responsibility for works: THAMES WATER 
      Current status: Planned work about to start 
 Westway, London
      07 August — 09 August Delays likely Road closure 
      Works description: Cyclical Expansion joint safety checks / maintenance works. 
      Responsibility for works:Transport for London 
      Current status: Planned work about to start
Information supplied by roadworks.org
August 6, 2018
  |