A402 Goldhawk Road, London, Hammersmith And Fulham |
05 September — 09 September |
|
|
Delays likely Lane closure |
|
Works location: A402 |
|
|
Works description: Lay New Domestic 32mm Pe Service 5m From Main In Carriageway |
|
|
Responsibility for works: National Grid Gas Plc |
|
|
Current status: Planned work about to start |
|
|
|
|
B412 St Mark's Road, London, Kensington And Chelsea
|
06 September — 18 October |
|
|
Delays likely Road closure |
|
Works location: B412 |
|
|
Works description: Reconstruction Of Roundabout And Pedestrian Refuge Islands And Paving Works |
|
|
Responsibility for works: Kensington and Chelsea Royal Borough Council |
|
|
Current status: Advanced planning |
|
|
|
|
A315 Hammersmith Road, London, Hammersmith And Fulham |
05 September — 25 November |
|
|
Delays possible Some carriageway incursion |
|
Works location: A315 |
|
|
Works description: Build 4 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Build 6 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Build 9 Concrete Chamber 725mm X 255mm X 665mm Deep In Footway,Demolish 19 Existing Jointbox(S) Or Cabinet Base(S),Install 5m2 Of Brickwork Within A Chamber,Replace 2 Jointbox Frame And Cover(S) (625mm X 625mm) In Footway,Replace 21 Jointbox Frame And Cover(S) (1310mm X 610mm) In Footway,Replace 22 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway,Replace 5 Jointb |
|
|
Responsibility for works: BT |
|
|
Current status: Advanced planning |
|
|
|
|
A315 Hammersmith Road, London, Hammersmith And Fulham |
06 September — 07 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: A315 |
|
|
Works description: Remedial Reinstatement - 2 M In C/W Black Anti Skid Required |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A315 Hammersmith Road, London, Hammersmith And Fulham |
06 September — 07 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: A315 |
|
|
Works description: Defect Repair In The Footway |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
06 September — 07 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: A4020 |
|
|
Works description: Customer Connection New Residential Supply. Clear Blocked Tee & Repair Blockages If Found, Footway Works Only |
|
|
Responsibility for works: Virgin Media |
|
|
Current status: Planned work about to start |
|
|
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
06 September — 08 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: A4020 |
|
|
Works description: Install 2m Of 1 Way Poly Duct In Verge,Provide 1 Core Drill(S) Into Jointbox Or Building |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
05 September — 07 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: A402 |
|
|
Works description: Build New Chamber In Footway |
|
|
Responsibility for works: Virgin Media |
|
|
Current status: Planned work about to start |
|
|
|
|
A40 Shepherd's Bush Green, London, Hammersmith And Fulham |
05 September — 07 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: A40 |
|
|
Works description: Blocked Drain Outside Entrance To Shepherds Court Tower Block Its All In The Bus Stop Area. Fmc Have Tried To Clear - Jetted Approx 15 Mtrs Unable To Get Running. Please Replace / Repair The Connection And Amend The Items As Necessary. (H Gully Non Runner) |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
Bramley Road, London, Kensington And Chelsea |
05 September — 07 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Virgin Media |
|
|
Current status: Planned work about to start |
|
|
|
|
Hammersmith Grove, London, Hammersmith And Fulham |
05 September — 09 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
Queensdale Road, London, Kensington And Chelsea |
06 September — 06 September |
|
|
Delays possible Traffic control (Stop/Go boards) |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|