Tubes and trains affected by engineering works and weather
Sunday 11 March
Buses replace trains in the Hounslow area -
- The lines between Barnes and Feltham via Hounslow will be closed all day Sunday .
- Trains between London Waterloo and Woking via Hounslow and Staines will be diverted between Barnes and Feltham , calling at Richmond and Twickenham .
- Bus services will run between Barnes and Twickenham via Brentford and Hounslow.
- The afternoon and evening services between London Waterloo and Kingston via Hounslow and Twickenham will not run. Extra bus services will run as above.
Saturday 10 and Sunday 11 March
No service between Hammersmith / High Street Kensington and Baker Street. Trains will operate between High Street Kensington and Barking (via Victoria) and between High Street Kensington and Baker Street (via Aldgate)
Saturday 10 and Sunday 11 March
Before 9am and after 9pm each day, no service between Kensington (Olympia) and Earl's Court.
No service between High Street Kensington and Edgware Road
Saturday 10 and Sunday 11 March
No service between Hammersmith and Baker Street
Sunday 11 March
No service between Camden Road and Richmond until 11am, Willesden Junction and Shepherd's Bush until 11.30am due to Network Rail infrastructure work.
Saturday 24 and Sunday 25 March
No Circle line service throughout the line
Saturday 24 and Sunday 25 March
No service between High Street Kensington and Edgware Road
Saturday 24 and Sunday 25 March
No service between Hammersmith and Moorgate
Saturday 31 March and Sunday 1 April
No service between Hammersmith and Edgware Road
Saturday 31 March and Sunday 1 April
No service between High Street Kensington and Edgware Road
Saturday 31 March and Sunday 1 April
No service between Hammersmith and Edgware Road
No planned engineering works
No planned engineering works
The information above is specific to West and South West London. There may be disruption elsewhere on local transport networks.
March 8, 2018
|