Where to expect diversions and delays
Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.
A315 King Street, London, Hammersmith and Fulham
19 March — 25 March
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: LAY NEW DOMESTIC SERVICE 3M FROM MAIN IN NEARSIDE CARRIAGEWAY
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000922468
A402 Goldhawk Road, London, Hammersmith and Fulham
21 March — 26 March
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Network Operations Distribution:Install / Replace / Remove electrical link box:LB No. 120564 - Replace a very poor condition Link Box in the footway. Part of HSE Initiative to replace all Identified High Risk Link Boxes. Foot way closed walk way in the c/w.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40010778934
A4 West Cromwell Road, London, Kensington and Chelsea
21 March — 21 March
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Installation of 3 Bay Non Ad Bus Shelter, Centre of Path, for and on behalf of Transport for London. Shelter ref 0120/0045 2892604
Responsibility for works: LONDON TRANSPORT
Current status: Planned work about to start
Works reference: RK00100046143
Information supplied by one.network
|