Where to expect diversions and delays
Hammersmith Bridge is closed to vehicular traffic indefinitely due to safety concerns. For further information contact the London Borough of Hammersmith & Fulham via email at bridgeproject@lbhf.gov.uk.
A219 Shepherd's Bush Road, London, Hammersmith and Fulham
07 February — 10 February
Delays likely - Lane closure
Works location: Unknown
Works description: Network Operations Distribution:Install / Replace / Remove electrical link box:LB No. 120081 - Replace a very poor condition Link Box in the footway. Part of HSE Initiative to replace all Identified High Risk Link Boxes. Foot way closed walk way in the c/w. Lane closure required TM sent and attached
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40010775684
A219 Shepherd's Bush Road, London, Hammersmith and Fulham
09 February — 09 February
Delays likely - Lane closure
Works location: Unknown
Works description: DISCONNECT SERVICE FROM MAIN IN CARRIAGEWAY
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000908502
A219 Shepherd's Bush Road, London, Hammersmith and Fulham
08 February — 09 February
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Install 10m of 1 way poly duct in Footway,Provide 4 core drill(s) into jointbox or building
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500292944100
A219 Fulham Palace Road, London, Hammersmith and Fulham
08 February — 08 February
Delays likely - Traffic control (multi-way signals)
Works location: Unknown
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141JRMZ--000005
Information supplied by one.network
|