Where to expect diversions and delays
A219 Shepherd's Bush Road, London, Hammersmith and Fulham
26 October — 27 October
Delays likely - Traffic control (two-way signals
Works location: Unknown
Works description: Install 10m of 1 way poly duct in Carriageway,Install 4m of 1 way poly duct in Footway,Provide 2 core drill(s) into jointbox or building,Provide 4 core drill(s) into jointbox or building
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500284745302
A306 Hammersmith Bridge Road, London, Hammersmith and Fulham
21 October — 26 October
Delays likely - Lane closure
Works location: Unknown
Works description: TO DISCONNECT A 125MM GAS SERVICE PIPE
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000870265
A315 Hammersmith Road, London, Hammersmith and Fulham
23 October — 25 October
Delays likely - Lane closure
Works location: Unknown
Works description: Maintenance visit to upstream monitoring equipment for Thames Tideway. No excavation, no noisy works.
Responsibility for works: THAMES TIDEWAY TUNNEL LTD
Current status: Planned work about to start
Works reference: ZE40500000361
Information supplied by one.network
|