Forthcoming Roadworks in Hammersmith


Where to expect diversions and delays

Road closed image

 

A219 Fulham Palace Road, London, Hammersmith and Fulham
15 September — 15 September
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141DFMC--000004

 

Brook Green, London, Hammersmith and Fulham
15 September — 27 September
Delays possible Some carriageway incursion
Works location: Unknown
Works description: SEW BLCK TRAFFIC SENSITIVE ST
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141KNPN--000001

 

 

 

A315 Hammersmith Road, London, Hammersmith and Fulham

09 September — 13 October
Delays possible Some carriageway incursion
Works location: Unknown
Works description: WORKING ON BEHALF OF THAMES WATER TO INSTALL PRESSURE REDUCING VALVE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU821H676G/PBAT08/I002

 

 

 

 

 

Information supplied by roadworks.org

 

Related links

 

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith