Upcoming Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A4 West Cromwell Road 
12 October — 15 October 
Delays likely Lane closure 
Works description: Arqiva 5G Excavate footway and cw to locate and repair damaged duct 
Responsibility for works: CITYFIBRE METRO NETWORKS LTD 

A4 West Cromwell Road
11 October — 13 October
Delays likely Lane closure
Works description:Maintenance - BROKEN GULLY FRAME. Lane 1 
Responsibility for works: Transport for London 

Blythe Road 
11 October — 16 October 
Delays possible Some carriageway incursion 
Works description: Boundary Box Exchange Fway in Footway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works:THAMES WATER

Blythe Road 
12 October — 18 October 
Delays possible Some carriageway incursion  
Works description: Connections Highway Services:Works on behalf of local authority (Works For Road Purposes) :Column Connection Scheme on behalf of LBHF
Responsibility for works: Hammersmith and Fulham 

A219 Fulham Palace Road
12 October — 17 October 
Delays possible Some carriageway incursion  
Works description: Arqiva 5G excavate fw to install new duct 
Responsibility for works: CITYFIBRE METRO NETWORKS LTD

402 Goldhawk Road
12 October — 17 October
Delays likely Traffic control (multi-way signals) 
Works description: DSLAM STREET CABINET & POWER INSTALLATION. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. 
Responsibility for works: Openreach 

Information supplied by roadworks.org

Related links
Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith