Upcoming Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A219 Fulham Palace Road
13 September — 14 September
Delays likely Traffic control (multi-way signals) 
Works description: Excavate in the CW approx 1m x 1m square, make interim reinstatement permanent.
Responsibility for works: THAMES WATER 

A315 Hammersmith Road
14 September — 19 September
Delays likely Lane closure
Works description: remedial reinstatement in footway Responsibility for works: VIRGIN MEDIA

A315 King Street
14 September — 2 October 
Delays likely Road closure 
Works description:TEST 
Responsibility for works: Hammersmith and Fulham 

A219 Fulham Palace Road 
13 September — 18 September
Delays possible Some carriageway incursion 
Works description: Arqiva 5G excavate footway to install new duct 
Responsibility for works: CITYFIBRE METRO NETWORKS LTD
 

A219 Fulham Palace Road
14 September — 17 September 
Delays possible Some carriageway incursion
Works description: Trial digs around shelter to confirm type of foundations - 0113/0256 
Responsibility for works: LONDON TRANSPORT 

A306 Hammersmith Bridge Road
14 September — 17 September 
Delays possible Some carriageway incursion 
Works description: Trial digs around shelter to confirm type of foundations - 0113/0082 
Responsibility for works: LONDON TRANSPORT

B408 Paddenswick Road
20 August — 01 October 
Delays likely Traffic control (multi-way signals) 
Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY & CARRIAGEWAY
Responsibility for works: THAMES WATER 

 

Information supplied by roadworks.org

Related links
Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith