Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead
A219 Shepherd's Bush Road, London, Hammersmith and Fulham |
07 December — 08 December |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: Excavate carriageway to repair failed reinstatement |
|
|
Responsibility for works: VIRGIN MEDIA |
|
|
Current status: Planned work about to start |
|
|
Works reference: NK100/SCLDMA/NLO00204A |
|
|
|
Southcombe Street, London, Hammersmith and Fulham |
04 December — 08 December |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: Unknown |
|
|
Works description: DSLAM STREET CABINET & POWER INSTALLATION plus PCP RESHELL. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
|
Vernon Street, London, Hammersmith and Fulham |
04 December — 08 December |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: Unknown |
|
|
Works description: DSLAM STREET CABINET & POWER INSTALLATION plus PCP RESHELL. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site. |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
Information supplied by Roadworks.org
December 8, 2017
|