Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A315 King Street, London, Hammersmith And Fulham

21 December — 29 December Traffic control (priority working)

Delays likely due to Streetworks
Install 15m Of 1 Way Poly Duct In Carriageway,Install 48m Of 1 Way Poly Duct In Footway at A315

Responsibility: BT

EToN status: Planned work about to start

A315 Beadon Road, London, Hammersmith And Fulham

21 December — 23 December Some carriageway incursion

Delays possible due to Streetworks
Hand Excavate And Install Bulk Meter On Behalf Of Thames Water at A315

Responsibility: Thames Water

EToN status: Planned work about to start

A3220 Addison Crescent, London, Kensington And Chelsea

22 December — 22 December Some carriageway incursion

Delays possible due to Streetworks
Horts - Crown Lift Trees And Remove Stakes Part Fw And Part Lane 1 at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea

22 December — 22 December Some carriageway incursion

Delays possible due to Streetworks
Horts - Crown Lift& Remove Broken Limb Part Fw And Part Lane 1 at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

B408 Askew Road, London, Hammersmith And Fulham

22 December — 23 December Some carriageway incursion

Delays possible due to Streetworks
Remedial Reinstatement, Ha Defect Replacing Slabs at B408

Responsibility: BT

EToN status: Planned work about to start

Coningham Road, London, Hammersmith And Fulham

21 December — 23 December Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Virgin Media

EToN status: Planned work about to start

 

December 21, 2015

 

 

 

 


Information supplied by Roadworks.org

 

December 21, 2015

 

Related links

 

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith