A315 Beadon Road, London, Hammersmith And Fulham
30 October — 30 October Lane closure
Delays likely due to Streetworks
Interim To Permanent Reinstatement at A315
Responsibility: Vodafone Group
EToN status: Planned work about to start
A402 Goldhawk Road, London, Hammersmith And Fulham
30 October — 04 December Lane closure
Delays likely due to Streetworks
Connections Projects:Cable Laying: (Approx Depth 450mm-600mm):(Ntr) Townhouse Studios, 140 Goldhawk Road W12 8hh - Excavate And Lay Ducts From 140 Goldhawk Road To 150 Goldhawk Road In Carriageway, Large Tree And Existing Pits In Footway Force The Carriageway Track. Pull In Cable at A402
Responsibility: UK Power Networks
EToN status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
30 October — 01 November Some carriageway incursion
Delays possible due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 130723 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at A3218
Responsibility: UK Power Networks
EToN status: Planned work about to start
A3220 Addison Road, London, Kensington And Chelsea
30 October — 30 October Some carriageway incursion
Delays possible due to Streetworks
Clear Blocked Tee& Repair Blockages If Found, Footway Works Only at A3220
Responsibility: Virgin Media
EToN status: Planned work about to start
A3220 Holland Road, London, Kensington And Chelsea
30 October — 31 October Some carriageway incursion
Delays possible due to Streetworks
Maintenance: 1xrocking Slab& 1x Sunken Slab By Valve Cover -Make Safe Part F/W Part Lane 2 at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A4 Talgarth Road, London, Hammersmith And Fulham
30 October — 05 November Some carriageway incursion
Delays possible due to Streetworks
Connections Highway Services:Works For Road Purposes: (Notice For Information Only):Electrical Connection To Lamp Column On Behalf Of Lbhf at A4
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
Baron'S Court Road, London, Hammersmith And Fulham
30 October — 03 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Coningham Road, London, Hammersmith And Fulham
31 October — 03 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Crabtree Lane, London, Hammersmith And Fulham
30 October — 03 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

 

 