Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

B317 North End Road, London, Hammersmith And Fulham
21 August — 23 August Traffic control (multi-way signals)
Delays likely due to Streetworks
Repair To A Damaged Water Main In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at B317
Responsibility: Thames Water
EToN status: Planned work about to start
A3220 Warwick Road, London, Kensington And Chelsea
22 August — 29 August Some carriageway incursion
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement at A3220
Responsibility: UK Power Networks
EToN status: Planned work about to start
Hammersmith Grove, London, Hammersmith And Fulham
21 August — 25 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start

Information supplied by Roadworks.org

 

August 21, 2015

 

 

 

Related links
Related Links

Roadworks

Live Travel News for Hammersmith