A219 Fulham Palace Road, London, Hammersmith And Fulham |
17 August — 20 August Contra-flow |
Delays likely due to Streetworks
District Metering Exchange - Surface C--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A219 Fulham Palace Road, London, Hammersmith And Fulham |
17 August — 28 August Road closure |
Delays likely due to Streetworks
Anchor Installation. Full Closure Of Fulham Palace Road Northbound And Southbound. at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A219 Queen Caroline Street, London, Hammersmith And Fulham |
17 August — 28 August Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Queen Caroline Street With Agreed Diversion Route. at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
17 August — 28 August Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
18 August — 01 September Traffic control (two-way signals) |
Delays likely due to Streetworks
Construct A New Manhole O/S 282 In The Carriageway To Install An Anti-Flooding Device To Prevent Internal Sewer Flooding To The Property. A Slip Trench Across The Footpath Is Required For An Electricity Cable Connection To The Property. at A3218 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A4 Talgarth Road, London, Hammersmith And Fulham |
17 August — 20 August Lane closure |
Delays likely due to Streetworks
Pedestrian And Road Safety Improvement Works - Lane 1 Switch To Lane 2 And 3 Closure Eb, Lane 1 Switch To Lane 2 And 3 Closure Wb, 22:00 To 05:00 at A4 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
|
|
|
|
A219 Butterwick, London, Hammersmith And Fulham |
17 August — 19 August Some carriageway incursion |
Delays possible due to Streetworks
Demolish And Rebuild Box In Footway at A219 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
|
|
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
18 August — 21 August Some carriageway incursion |
Delays possible due to Streetworks
This Permit Is For Thames Water Which Will Involve Carryin Out A Disconnection, Works In The Footway And Carriageway In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase at A219 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
|
A315 Hammersmith Road, London, Hammersmith And Fulham |
18 August — 20 August Some carriageway incursion |
Delays possible due to Streetworks
Fire Hydrant Standard Repair In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A315 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A3220 Holland Road, London, Kensington And Chelsea |
17 August — 18 August Some carriageway incursion |
Delays possible due to Streetworks
Maintenance - Resurface Cracking Around Gully With Sma In Lane 1 Susp Bs 1791 Part F/Way Part Lane 1 at A3220 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A3220 Holland Road, London, Kensington And Chelsea |
18 August — 20 August Some carriageway incursion |
Delays possible due to Streetworks
Customer Side Leakage Supply Pipe Replacement at A3220 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
|
|
|
|