Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A219 Fulham Palace Road, London, Hammersmith And Fulham
26 June — 26 June Traffic control (two-way signals)
Delays likely due to Streetworks
Perm. Repair. Internally Reported Defect at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A3219 Munster Road, London, Hammersmith And Fulham
27 June — 28 June Traffic control (two-way signals)
Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at A3219
Responsibility: BT
EToN status: Planned work about to start
A40/A3220 West Cross Route, London, Kensington And Chelsea
27 June — 28 June Lane closure
Delays likely due to Streetworks
Removal Of Crane Part Outer Ring S/E Part Of Rbt 0700 To 18:00 at A40/A3220
Responsibility: Transport For London
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
27 June — 28 June Contra-flow
Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway at B317
Responsibility: BT
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
26 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
11/053 - Installation Of Cat5 Cable To Rsm Scoot Upgrade, Footpath Access To Pole 1 Only. No Incursion On The Carriageway, 1000 - 1500 at A315
Responsibility: Transport For London
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
26 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
11/116 - Installation Of Cat5 Cable To Rsm Scoot Upgrade, Footpath Access To Pole 1&3 Only. No Incursion On The Carriageway, 1000 - 1500 at A315
Responsibility: Transport For London
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
26 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
11/116 - Installation Of Cat5 Cable To Rsm Scoot Upgrade, Footpath Access To Pole 1&4 Only. No Incursion On The Carriageway, 1000 - 1500 at A315
Responsibility: Transport For London
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
26 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
Remedial Rectification In Fw To Be Completed By Digimage at A315
Responsibility: Thames Water
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
26 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
Remedial Rectification In Fw To Be Completed By Digimage at A315
Responsibility: Thames Water
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
27 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct at A315
Responsibility: BT
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
26 June — 29 June Some carriageway incursion
Delays possible due to Streetworks
Customer Connection Residential Supply & Clear Blockages If Found. Footway Works Only at A4020
Responsibility: Virgin Media
EToN status: Planned work about to start
Bramber Road, London, Hammersmith And Fulham
26 June — 02 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Fulcrum Pipelines Limited
EToN status: Planned work about to start

 

 

Information supplied by Roadworks.org

 

 

 

Related links
Related Links

Roadworks

Live Travel News for Hammersmith