Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A315 Chiswick High Road, Chiswick, London, London Borough Of Hounslow
12 June — 12 June Lane closure
Delays likely due to Streetworks
11/010 Tel27014 - To Replace Magnetometer Sd0 And Sd1, West Bound C/W Swapping Lane 1 & 2 And F/W To Chamber (Ped Access Maintained) 10.00-15.00 at A315
Responsibility: Transport For London
EToN status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
13 June — 14 June Traffic control (two-way signals)
Delays likely due to Streetworks
To Exchange Faulty Pump In Manhole Chamber. No Excavation at A3218
Responsibility: Thames Water
EToN status: Planned work about to start
A40/A3220 West Cross Route, London, Kensington And Chelsea
13 June — 14 June Lane closure
Delays likely due to Streetworks
Removal Of Crane Part Outer Ring S/E Part Of Rbt 07:00 To 18:00 at A40/A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
12 June — 16 June Lane closure
Delays likely due to Streetworks
Remove Shelter 0113/1011 2323356 at A4020
Responsibility: London Transport
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
12 June — 15 June Contra-flow
Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway at B317
Responsibility: BT
EToN status: Planned work about to start
Blythe Road, London, Hammersmith And Fulham
13 June — 14 June Traffic control (two-way signals)
Delays likely due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
12 June — 15 June Some carriageway incursion
Delays possible due to Streetworks
Remedial Works In Footway - Ha Defect To Redo Fillet at A219
Responsibility: BT
EToN status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
13 June — 14 June Some carriageway incursion
Delays possible due to Streetworks
1x32mm Mdpe Supply Connection And 1x25mm Mdpe Supply Connection Infootway And In Carriageway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A306 Castelnau, Barnes, Richmond Upon Thames
13 June — 14 June Some carriageway incursion
Delays possible due to Streetworks
Main Clamp 0 To 6" Fway In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A306
Responsibility: Thames Water
EToN status: Planned work about to start
A315 Kensington High Street, London, Kensington And Chelsea
12 June — 15 June Some carriageway incursion
Delays possible due to Streetworks
District Metering X-Bond - Surface B--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A315
Responsibility: Thames Water
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
12 June — 16 June Some carriageway incursion
Delays possible due to Streetworks
Carry Out Boundary Box Exchange In The Footway In Footway. Our Intentionis To Complete The Permanent Reinstatement In The Same Phase at A4020
Responsibility: Thames Water
EToN status: Planned work about to start
Estcourt Road, London, Hammersmith And Fulham
12 June — 16 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

 

Information supplied by Roadworks.org

 

 

 

Related links
Related Links

Roadworks

Live Travel News for Hammersmith