Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A306 Hammersmith Bridge Road, London, Hammersmith And Fulham
07 March — 08 March
Delays likely Contra-flow
Works location: A306
Works description: Lay New Domestic Service 2m From Main In Footway
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
07 March — 08 March
Delays likely Traffic control (two-way signals)
Works location: A3219
Works description: Disconnect A Redundant Water Supply In The Footway And Carriageway Incarriageway. Our Intention Is To Complete The Permanent Reinstatement Inthe Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
A3220 Warwick Road, London, Kensington And Chelsea
07 March — 08 March
Delays likely Lane closure
Works location: A3220
Works description: Crane - Tm: Lane 1 Closure - Working Hours: 04:00 On Saturday To 20:00 On Sunday - 24h Contact: Philip Wilson 07833 236234
Responsibility for works: Transport For London
Current status: Planned work about to start
A402 Goldhawk Road, London, Hammersmith And Fulham
07 March — 08 March
Delays likely Lane closure
Works location: A402
Works description: This Permit Is For Thames Water, Which Will Involve Carrying Out Remedial Works To Replace Anti Skid
Responsibility for works: Thames Water
Current status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
07 March — 10 March
Delays possible Some carriageway incursion
Works location: A219
Works description: Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Interim - Permanent Reinstatement
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
06 March — 06 March
Delays possible Some carriageway incursion
Works location: A315
Works description: District Metering Miscellaneous Repair - Surface B--Works Intended To Include First Time Permanent Reinstatement Within Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
A3220 Warwick Gardens, London, Kensington And Chelsea
06 March — 07 March
Delays possible Some carriageway incursion
Works location: A3220
Works description: Maintenance - Relay 3 Loose 600 Slabs Part F/Way, Part Lane 1
Responsibility for works: Transport For London
Current status: Planned work about to start
A4 Great West Road, London, Hammersmith And Fulham
06 March — 13 March
Delays possible Some carriageway incursion
Works location: A4
Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120372 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours.
Responsibility for works: UK Power Networks
Current status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
06 March — 10 March
Delays possible Some carriageway incursion
Works location: B317
Works description: Blocked Duct In Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start
B408 Dalling Road, London, Hammersmith And Fulham
06 March — 10 March
Delays possible Some carriageway incursion
Works location: B408
Works description: B Box Install In The Fway In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start

 

 

Information supplied by Roadworks.org

 

 

 