Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead
Roadworks |
A3220 Holland Road, London, Kensington And Chelsea |
06 February — 07 February |
Delays likely Lane closure |
Works location: A3220 |
Works description: Maintenance - Pothole Area 0.5m Sq. Part Lane Closure |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
A3220 Warwick Road, London, Kensington And Chelsea |
06 February — 07 February |
Delays likely Lane closure |
Works location: A3220 |
Works description: Maintenance - Coring Investigation Lane 1 |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
A3220 Warwick Road, London, Kensington And Chelsea |
06 February — 15 February |
Delays likely Lane closure |
Works location: A3220 |
Works description: Connections Projects:Cable Laying: (Approx Depth 450mm-600mm):Exc Joint Hole In Fw O/S 185, 195 And Opposite Warwick Arms (Ph), Also Excavate In The Fw And Cw Outside Durrels House |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
07 February — 10 February |
Delays possible Some carriageway incursion |
Works location: A3218 |
Works description: Remedial Ha Defect To Redo Fillet |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B317 North End Road, London, Hammersmith And Fulham |
06 February — 10 February |
Delays possible Some carriageway incursion |
Works location: B317 |
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
B317 North End Road, London, Hammersmith And Fulham |
06 February — 10 February |
Delays possible Some carriageway incursion |
Works location: B317 |
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct In Footway |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
St Peter'S Road, London, Hammersmith And Fulham |
07 February — 08 February |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
Information supplied by Roadworks.org
|