Upcoming Roadworks in Fulham


Where to expect delays and closures in days ahead

Hammersmith Bridge is closed to vehicular traffic for the foreseeable future.

North End Road
02 February — 02 February
Delays likely - Traffic control (two-way signals)
Works location: 11/145 - North End Road, West Kensington, Hammersmith and Fulham - At the junction with Barons Court Road - Main pedestrian crossing switched out and Ped temps installed mimicking existing timings. Lane 1 closure North End Road northbound, to allow Welfare and works area deployed as per TM plan. Temps in situ 24/7. Welfare and works area deployed as per TM plan. Temps in situ 24/7
Works description : Upgrade of Pedestrian Crossing, Removal and re-installation of traffic signal posts and controller
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference:  YG51875076155

Bishop's Road
01 February — 10 February
Delays likely - Traffic control (two-way signals)
Works location: Between Clonmel Road and Gironde Road
Works description : Bishop's Road 5. Laying ducting for fibre connection to chambers in Bishop's Road. Linked with TW018JSM-01-21-098 (Homestead Road), TW018JSM-01-21-099 (Kelvedon Road), and TW018JSM-01-21-100 (Wheatsheaf Terrace).
Responsibility for works: G. Network Communications Ltd
Current status: Planned work about to start
Works reference:  TW018JSM-01-21-043

Homestead Road
02 February — 04 February
Delays likely - Traffic control (multi-way signals)
Works location: Junction with Parkville Road
Works description: Parkville Road. Laying ducting for fibre connection to chambers in Parkville Road. Linked with TW018JSM-01-21-018 (Parkville Road).
Responsibility for works: G. Network Communications Ltd
Current status: Planned work about to start
Works reference: TW018JSM-01-21-020

Lillie Road
01 February — 06 March
Delays likely - Traffic control (multi-way signals)
Works location: Between 107 and 26
Works description : Lillie Road 1-4. Laying ducting for fibre connection to chambers in Lillie Road. Linked with TW018JSM-01-21-063 (North End Road). Working from Lillie Road 4 to Lillie Road 1.
Responsibility for works: G. Network Communications Ltd
Current status: Advanced planning
Works reference:  TW018JSM-01-21-062

Munster Road
01 February — 01 April
Delays likely - Traffic control (multi-way signals)
Works location: Between Chaldon Road and Fernherst Road
Works description : Munster Road 2, 3, 4, 5, 7. Laying ducting for fibre connection to chambers in Munster Road.
Responsibility for works: G. Network Communications Ltd
Current status: Planned work about to start
Works reference:  TW018JSM-01-21-064

New King's Road
02 February — 04 February
Delays likely - Traffic control (two-way signals)
Works location: Outside 116 New King's Road SW6 4RF
Works description : Essential Thames Water Maintenance works to excavate and uncover chamber, repair leaking Gate Valve, rebuild chamber and reinstatement. TfL reference N2104728
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference:  MU03236502308

Star Road
01 February — 27 February
Delays likely - Traffic control (two-way signals)
Works location: From J/W North End Road to J/W Normand Road
Works description : Star Road 1, 2 & 3 - Install duct for Superfast Broadband on behalf of G.Network in F/W & C/W with ref to - TW018-JSM-01-21-045 - TM Plans attached.
Responsibility for works: G. Network Communications Ltd
Current status: Planned work about to start
Works reference:  TW018JSM-01-21-044

Information supplied by  one.network