Upcoming Roadworks in Fulham


Related links
Upcoming Roadworks in Fulham

Where to expect delays and closures in days ahead

Hammersmith Bridge is closed to vehicular traffic for the foreseeable future.

A308 New King's Road, London, Hammersmith and Fulham

07 April — 01 May
Delays likely - Traffic control (two-way signals)
Works location: Unknown
Works description: Connections Projects:Installation of a new electricity supply for a customer:Excavation of trench to install 125mm ducts for 11kv cables with backfill and reinstatement to HAUC spec
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40010779181

A308,A3217 King's Road
02 April — 09 April
Delays possible - Some carriageway incursion
Works description: Network Operations Distribution:Install / Replace / Remove electrical link box:excavation to install 2 way link box as part of a larger project to reconfigure the network in the area to improve performance and lower the load on the system. foot way closed walk way in the c/w
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start

A308,A3217 King's Road
03 April — 01 July
Delays likely - Traffic control (two-way signals)
Works description: CISBOT Internal Mains Sealing long cycle phase 5
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000883597

A219 Fulham Palace Road
03 April — 09 April
Delays likely - Contra-flow
Works description: HH 185 Plot1,3x25mm MDPE mtrd Supply FOR NEW WATER SUPPLY IN FW AND inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU307000808689650045-001

A308 New King's Road, London, Hammersmith and Fulham

09 April — 15 April
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair >33mm Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031444923-001

B317 North End Road, London, Hammersmith and Fulham

08 April — 09 April
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: DISTRICT METER MOVE C/W ATPLAS TO F/W - COLLABORATION WORKING WITH H20 PERMIT AGREED MU821-H577/ABAT09/I002 and MU821-H577/ABAT09/I003
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU288DM18799-3

 

Information supplied by  one.network