Where to expect delays and closures in days ahead
Hammersmith Bridge is closed to vehicular traffic for the foreseeable future.
A308 New King's Road, London, Hammersmith and Fulham
07 April — 01 May
Delays likely - Traffic control (two-way signals)
Works location: Unknown
Works description: Connections Projects:Installation of a new electricity supply for a customer:Excavation of trench to install 125mm ducts for 11kv cables with backfill and reinstatement to HAUC spec
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC40010779181
A308,A3217 King's Road
02 April — 09 April
Delays possible - Some carriageway incursion
Works description: Network Operations Distribution:Install / Replace / Remove electrical link box:excavation to install 2 way link box as part of a larger project to reconfigure the network in the area to improve performance and lower the load on the system. foot way closed walk way in the c/w
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
A308,A3217 King's Road
03 April — 01 July
Delays likely - Traffic control (two-way signals)
Works description: CISBOT Internal Mains Sealing long cycle phase 5
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000883597
A219 Fulham Palace Road
03 April — 09 April
Delays likely - Contra-flow
Works description: HH 185 Plot1,3x25mm MDPE mtrd Supply FOR NEW WATER SUPPLY IN FW AND inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU307000808689650045-001
A308 New King's Road, London, Hammersmith and Fulham
09 April — 15 April
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair >33mm Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031444923-001
B317 North End Road, London, Hammersmith and Fulham
08 April — 09 April
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: DISTRICT METER MOVE C/W ATPLAS TO F/W - COLLABORATION WORKING WITH H20 PERMIT AGREED MU821-H577/ABAT09/I002 and MU821-H577/ABAT09/I003
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU288DM18799-3