Upcoming Roadworks in Fulham |
Where to expect delays and closures in days ahead Hammersmith Bridge is closed to vehicular traffic for the foreseeable future. A304 Fulham Broadway, London, Hammersmith and Fulham 04 April — 05 April Delays likely - Traffic control (multi-way signals) Works location: Unknown Works description: TFL REF - N2003739 new water supply. NHH Plot 1, 1x32mm MDPE mtrdSupply. works in footwayand in Carriageway. Our intention is to complete the PermanentReinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU307000809983290090-001 A304 Fulham Road, London, Hammersmith and Fulham 04 April — 07 April Delays likely - Traffic control (multi-way signals) Works location: Unknown Works description: District meter Non Excavation permit for the TM only. In conjuction with DM09551. Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU288DM09551-1
A219 Fulham Palace Road, London, Hammersmith and Fulham 03 April — 09 April Delays likely - Contra-flow Works location: Unknown Works description: HH 185 Plot1,3x25mm MDPE mtrd Supply FOR NEW WATER SUPPLY IN FW AND inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU307000808689650045-001 A219 Fulham Palace Road, London, Hammersmith and Fulham 04 April — 09 April Delays likely - Traffic control (two-way signals) Works location: Unknown Works description: HH The Lodge Plot 1, 1x32mm BP mtrd Supp FOR NEW WATER SUPPLY IN FW ANDin Carriageway. Our intention is to complete the PermanentReinstatementin the same phase Responsibility for works: THAMES WATER Current status: Advanced planning
Information supplied by one.network
|