Upcoming Roadworks in Fulham |
Where to expect delays and closures in days ahead Hammersmith Bridge is closed to vehicular traffic for the foreseeable future. A217 Wandsworth Bridge Road, London, Hammersmith and Fulham 14 March — 15 March Delays likely - Traffic control (two-way signals) Works location: Unknown Works description: new water supply. HH Plots 1-4, 4x25mm MDPE mtrd Supply. works infoot way and in Carriageway. Our intention is to complete the PermanentReinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU307000809117940045-003
14 March — 15 March Delays likely - Traffic control (two-way signals) Works location: Unknown Works description: Install 13m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building Responsibility for works: Openreach Current status: Planned work about to start Works reference: BC006TI001LC500294263103
A304 Fulham Road, London, Hammersmith and Fulham 15 March — 15 March Delays likely - Lane closure Works location: Unknown Works description: INTERIM TO PERM IN THE CARRIAGEWAY Responsibility for works: VIRGIN MEDIA Current status: Planned work about to start Works reference: NK100/SCLJBU/124397/LBA
Information supplied by one.network
|