Upcoming Roadworks in Fulham
Where to expect delays and closures in days ahead
A308,A3217 King's Road, London, Kensington and Chelsea |
24 July — 26 July |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: Valve Locate fway and in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031276942-001 |
|
|
A308 New King's Road, London, Hammersmith and Fulham |
22 July — 02 August |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: 1x32mm MDPE mtrd W/regs FOR NEW WATER SUPPLY IN FW AND in Carriageway.Our intention is to complete the Permanent Reinstatement in the samephase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000808319320365-001 |
|
|
Parsons Green Lane, London, Hammersmith and Fulham |
22 July — 01 September |
Delays likely Road closure |
Works location: Unknown |
Works description: Installation of new sewer and manhole |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU297CCPARSONSGREENMW |
|
A219 Fulham Palace Road, London, Hammersmith and Fulham |
27 July — 28 July |
Delays likely Lane closure |
Works location: Unknown |
Works description: CARRY OUT FOOTWAY CIVILS AND COMPLETE INTERIM SITE FOR ANTI SKID MARKS IN THE CARRIAGEWAY - THIS PERMIT IS LINKED WITH PERMIT REFERENCE NK100/SCLJBU/112910/LBA2 WHICH WAS THE SECOND PHASE OF WORKS BUT HAS NOW BEEN ENTERED IN ON THIS PERMIT FOR INSPECTION PURPOSES AS A PHASE 2 |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJBU/112910/LBA1 |
Peterborough Road, London, Hammersmith and Fulham |
27 July — 28 July |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: Install 10m of 1 way poly duct in Carriageway,Install 12m of 1 way poly duct in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500281341001 |
Information supplied by roadworks.org
|