Upcoming Roadworks in Fulham


Where to expect delays and closures in days ahead

A3219 Munster Road
13 July — 14 July
Delays likely Traffic control (multi-way signals)
Works description: to excavate and lay new gas service approx 2.58m in c/way and 2.77m f/way
Responsibility for works: Fulcrum Pipelines Limited
Current status: Planned work about to start
Works reference: WY002NSA23548
A3205 Wandsworth Bridge Roundabout
14 July — 14 July
Delays likely Lane closure
Works description: Mobile apparatus - Impact on footway :apparatus barriered off with marshal in attendance; carriageway incursion - nearside lane closure - working hours 06:30 - 17:00 - Site contact: Dawn Harford 07739 606915
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG450412743
A219 Fulham Palace Road
13 July — 14 July
Delays likely Lane closure
Works description: CARRY OUT FOOTWAY CIVILS AND COMPLETE INTERIM SITE FOR ANTI SKID MARKS IN THE CARRIAGEWAY - THIS PERMIT IS LINKED WITH PERMIT REFERENCE NK100/SCLJBU/112910/LBA2 WHICH WAS THE SECOND PHASE OF WORKS BUT HAS NOW BEEN ENTERED IN ON THIS PERMIT FOR INSPECTION PURPOSES AS A PHASE 2
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SCLJBU/112910/LBA1
A219 Fulham Palace Road
13 July — 14 July
Delays likely Lane closure
Works description: CARRY OUT FOOTWAY CIVILS AND ANTI SKID MARKS IN THE CARRIAGEWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SCLJBU/112910/LBA2
B318 Harwood Road
11 July — 13 July
Delays likely Traffic control (two-way signals)
Works description: INSTALL FOOTWAY CHAMBER FOR CUSTOMER CONNECTION
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SCLJBU/117554/LBA1
Imperial Road
11 July — 16 July
Delays likely Traffic control (two-way signals)
Works description: NHH Plot1,1x63mm BP mtrd FOR NEW WATER SUPPLY IN FW AND in Carriageway.Our intention is to complete the Permanent Reinstatement in the samephase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU307000808456610135-001
Peterborough Road
10 July — 12 July
Delays likely Traffic control (multi-way signals)
Works description: Install 10m of 1 way poly duct in Carriageway,Install 12m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500281341000
 
Townmead Road
11 July — 15 July
Delays likely Traffic control (give & take)
Works description: Remove Kiosk
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005PP25W00002077313347
A217 Wandsworth Bridge Road
11 July — 12 July
Delays possible Some carriageway incursion
Works description: These works are for clearing a blockage in an existing fibre-optic network. These work may require accessing of existing chambers in the footway.
Responsibility for works: Hyperoptic Ltd
Current status: Planned work about to start
Works reference: TF001HYFIDIG-104544-0

 

Information supplied by roadworks.org

Related links
Related Links

Roadworks sign

Live Travel News for Fulham