Upcoming Roadworks in Fulham
Where to expect delays and closures in days ahead
A3219 Munster Road |
13 July — 14 July |
Delays likely Traffic control (multi-way signals) |
Works description: to excavate and lay new gas service approx 2.58m in c/way and 2.77m f/way |
Responsibility for works: Fulcrum Pipelines Limited |
Current status: Planned work about to start |
Works reference: WY002NSA23548 |
|
|
A3205 Wandsworth Bridge Roundabout |
14 July — 14 July |
Delays likely Lane closure |
Works description: Mobile apparatus - Impact on footway :apparatus barriered off with marshal in attendance; carriageway incursion - nearside lane closure - working hours 06:30 - 17:00 - Site contact: Dawn Harford 07739 606915 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG450412743 |
A219 Fulham Palace Road |
13 July — 14 July |
Delays likely Lane closure |
Works description: CARRY OUT FOOTWAY CIVILS AND COMPLETE INTERIM SITE FOR ANTI SKID MARKS IN THE CARRIAGEWAY - THIS PERMIT IS LINKED WITH PERMIT REFERENCE NK100/SCLJBU/112910/LBA2 WHICH WAS THE SECOND PHASE OF WORKS BUT HAS NOW BEEN ENTERED IN ON THIS PERMIT FOR INSPECTION PURPOSES AS A PHASE 2 |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJBU/112910/LBA1 |
|
|
A219 Fulham Palace Road |
13 July — 14 July |
Delays likely Lane closure |
Works description: CARRY OUT FOOTWAY CIVILS AND ANTI SKID MARKS IN THE CARRIAGEWAY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJBU/112910/LBA2 |
|
B318 Harwood Road |
11 July — 13 July |
Delays likely Traffic control (two-way signals) |
Works description: INSTALL FOOTWAY CHAMBER FOR CUSTOMER CONNECTION |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJBU/117554/LBA1 |
Imperial Road |
11 July — 16 July |
Delays likely Traffic control (two-way signals) |
Works description: NHH Plot1,1x63mm BP mtrd FOR NEW WATER SUPPLY IN FW AND in Carriageway.Our intention is to complete the Permanent Reinstatement in the samephase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000808456610135-001 |
Peterborough Road |
10 July — 12 July |
Delays likely Traffic control (multi-way signals) |
Works description: Install 10m of 1 way poly duct in Carriageway,Install 12m of 1 way poly duct in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500281341000 |
|
|
Townmead Road |
11 July — 15 July |
Delays likely Traffic control (give & take) |
Works description: Remove Kiosk |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005PP25W00002077313347 |
|
A217 Wandsworth Bridge Road |
11 July — 12 July |
Delays possible Some carriageway incursion |
Works description: These works are for clearing a blockage in an existing fibre-optic network. These work may require accessing of existing chambers in the footway. |
Responsibility for works: Hyperoptic Ltd |
Current status: Planned work about to start |
Works reference: TF001HYFIDIG-104544-0 |
|
Information supplied by roadworks.org
|