Upcoming Roadworks in Fulham
Where to expect delays and closures in days ahead
|
A304 Fulham Road, London, Hammersmith and Fulham |
30 June — 03 July |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: SEWER CCTV - INVESTIGATION |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141CXKD--000007 |
|
|
A3218 Lillie Road, London, Hammersmith and Fulham |
30 June — 30 June |
Delays likely Traffic control (two-way signals) |
Works location: Unknown |
Works description: REMOVE BLOCKAGE IN CARRIAGEWAY TO CONNECT CLIENT |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJFI/114972/LSM1 |
|
A219 Fulham High Street, London, Hammersmith and Fulham |
28 June — 02 July |
Delays possible Some carriageway incursion |
Works location: Unknown |
Works description: Main Clamp 0 to 6" Fway and Cway (kerb stones) in Footway. Our intentionis to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031292920-001 |
|
A219 Fulham Palace Road, London, Hammersmith and Fulham |
28 June — 02 July |
Delays likely Traffic control (multi-way signals) |
Works location: Unknown |
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141HZCM--000001 |
|
|
A219 Fulham Palace Road, London, Hammersmith and Fulham |
29 June — 30 June |
Delays likely Lane closure |
Works location: Unknown |
Works description: CARRY OUT FOOTWAY CIVILS AND ANTI SKID MARKS IN THE CARRIAGEWAY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SCLJBU/112910/LBA1 |
|
Information supplied by roadworks.org
|