Upcoming Roadworks in Fulham
Where to expect delays and closures in days ahead
| A304 Fulham Broadway, London, Hammersmith and Fulham |
| 02 June — 04 June |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: LANE 1 LANE CLOSURE TO ACCESS BT MANHOLES TO GULLY SUCK AND DESILT FOR THE INSTATTION OF SUB DUCT AND FIBRE EXCAVATE IF NEEDED |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005KN1W00000FULHAM-NS2 |
|
|
| A304 Fulham Broadway, London, Hammersmith and Fulham |
| 02 June — 05 June |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: SEWER CCTV - INVESTIGATION |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU575002141CXKD--000002 |
|
|
| A304 Fulham Road, London, Hammersmith and Fulham |
| 01 June — 02 June |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: Build 1 concrete chamber 1310mm x 610mm x 1265mm deep in Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 5m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500280436801 |
|
|
| |
|
| A304 Fulham Road, London, Hammersmith and Fulham |
| 02 June — 04 June |
| Delays likely Contra-flow |
| Works location: Unknown |
| Works description: CONTRA FLOW TRAFFIC MANAGEMENT SYSTEM TO ACCESS BT MANHOLE LOCATED IN THE BUS STOP OUTSIDE HAILFAX TO GULLY SUCK AND DESILT AND INSTALL SUB DUCT AND FIBRE |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005KN1W00000FULHAM-NS1 |
|
|
| A304 Fulham Road, London, Hammersmith and Fulham |
| 02 June — 04 June |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: 4 WAY TRAFFIC LIGHTS + 2 PEDESTRAIN CROSSINGS TO ACCESS BT MANHOLES IN JUNCTION OF WANDSDOWN ROAD TO GULLY SUCK AND DESILT FOR THE INSTATTION OF UNDERGROUND BT SUB DUCT AND FIBRE |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005KN1W00000FULHAM-NS4 |
|
|
| A304 Fulham Road, London, Hammersmith and Fulham |
| 02 June — 05 June |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: SEWER CCTV - INVESTIGATION |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU026002141CXKD--000005 |
|
| B317 North End Road, London, Hammersmith and Fulham |
| 02 June — 09 June |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: new water supply. HH Plot 1 , 1x25mm MDPE mtrd Supply. works in footwayand in Carriageway. Our intention is to complete the PermanentReinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU307000808696200045-001 |
| A304 Fulham Road, London, Hammersmith and Fulham |
| 28 May — 02 June |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: Works in to carry out Service pipe relay between the existing Water main and KENSINGTON PREPARATORY SCHOOL boundary, as part of Thames Water's Lead Pipe Replacement Project |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU276IA/AMP6/SCH/HAM/005 |
|
| A308 New King's Road, London, Hammersmith and Fulham |
| 31 May — 04 June |
| Delays likely Traffic control (give & take) |
| Works location: Unknown |
| Works description: Dig across Molesford Road fro CCTV duct, going from east to west. |
| Responsibility for works: Hammersmith and Fulham |
| Current status: Planned work about to start |
| Works reference: FE200AH/NKR/MOLESFORD315 |
| A217 Wandsworth Bridge Road, London, Hammersmith and Fulham |
| 28 May — 07 June |
| Delays likely Traffic control (Stop/Go boards) |
| Works location: Unknown |
| Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE CARRIAGEWAY AND FOOTWAY |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU287MGJV/FLIPS/214503 |
Information supplied by roadworks.org
|