Where to expect delays and closures in days ahead
| A217 Wandsworth Bridge Road, London, Hammersmith and Fulham |
| 22 March — 26 April |
| Delays likely Traffic control (Stop/Go boards) |
| Works location: Unknown |
| Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE CARRIAGEWAY AND FOOTWAY |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU287MGJV/FLIPS/214503 |
|
| A219 Fulham High Street, London, Hammersmith and Fulham |
| 23 March — 24 March |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: Install 31m of 1 way poly duct in Footway |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC006TI001LC500276736101 |
|
| A219 Fulham Palace Road, London, Hammersmith and Fulham |
| 24 March — 24 March |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: Network Operations Faults:Essential repair of electricity cables powering street lighting / furniture:Urgent Repairs to Street furniture. Lane closure required to allow for a walk way in the c/w to manage peds. 2 x bus stops to be suspended. we are looking to carry out a DJR TM attached and sent to LONDON Permit Scheme/ Janet Nairne. |
| Responsibility for works: UK POWER NETWORKS EASTERN & LONDON |
| Current status: Planned work about to start |
| Works reference: EC40010760731 |
|
| A219 Fulham Palace Road, London, Hammersmith and Fulham |
| 24 March — 25 March |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU026002141DFMC--000001 |
|
| A304 Fulham Road, London, Hammersmith and Fulham |
| 23 March — 23 March |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: Sahara survey for leak detection. No excavation, chamber opening only. |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU600CHB2986-2 |
|
| Carnwath Road, London, Hammersmith and Fulham |
| 23 March — 24 March |
| Delays possible Some carriageway incursion |
| Works location: Unknown |
| Works description: B Box Install <33mm Fway (vehicle cross over) in Footway. Ourintention is to complete the Permanent Reinstatement in the same phase |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU301000031250849-001 |
|
Information supplied by roadworks.org
|