Upcoming Roadworks Around Fulham


Related links
Upcoming Roadworks Around Fulham

Traffic delays likely due to lane and road closures in the area

 

A308 New King's Road
5 September — 7 September
Delays likely Lane closure 
Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY
Responsibility for works: THAMES WATER 

A3219 Dawes Road
5 September — 8 September 
Delays likely Traffic control (multi-way signals) 
Works description: Service Pipe Repair in Footway. Our intention is to complete Permanent Reinstatement in the same phase 
Responsibility for works: THAMES WATER 

A308,A304 Fulham Road
5 September — 8 September 
Delays possible Some carriageway incursion 
Works description: Service Pipe Repair in Footway. Our intention is to complete thePermanent Reinstatement in the same phase 
Responsibility for works: THAMES WATER 

A308,A304 Fulham Road
5 September — 8 September 
Delays possible Some carriageway incursion 
Works description: REINSTALL BUS SHELTER AND FEEDER PILLAR 
Responsibility for works:Kensington and Chelsea 

A217 Wandsworth Bridge Road
6 September — 21 September 
Delays likely Traffic control (multi-way signals) 
Works description: Arqiva 5G Excavate footway and carriageway to install new duct
Responsibility for works: CITYFIBRE METRO NETWORKS

Carnwath Road
6 September — 11 September 
Delays possible Some carriageway incursion
Works description: SEWER CLEANING EMERGENCY 
Responsibility for works: THAMES WATER 

Information supplied by roadworks.org