Traffic delays likely due to lane and road closures in the area
A304 Fulham Broadway
08 August — 13 August Delays likely Traffic control (multi-way signals)
Works description: Arqiva 5G. Excavate footway and carriageway to install new duct
Responsibility for works: CITYFIBRE METRO NETWORKS LTD
A304 Fulham Road
08 August — 11 August Delays likely Lane closure
Works description:IMGC190064 - LAY A 32mm service to box on property, connect to exisiting main in footway near side.
Responsibility for works: Cadent
B318 Harwood Road
08 August — 13 August Delays likely Traffic control (multi-way signals)
Works description: Arqiva 5G. Excavate footway and carriageway to install new duct
Responsibility for works: CITYFIBRE METRO NETWORKS LTD
A217 Wandsworth Bridge Road
25 July — 22 August
Delays likely Traffic control (multi-way signals)
Works description: Arqiva 5G Excavate footway and carriageway to install new duct
Responsibility for works: Cityfibre Metro Networks
B317 North End Road
24 July — 21 August
Delays likely Traffic control (multi-way signals)
Works description: Arqiva 5G. Excavate footway and carriageway to install new duct
Responsibility for works: Cityfibre Metro Networks
Information supplied by roadworks.org
|