Traffic delays likely due to lane and road closures in the area
North End Road is currently closed at its junction with Dawes Road for emergency work by Thames Water.
Local bus routes 28, 296, 211 and 391 are being diverted along Fulham and Dawes Roads.
Works by Cadent are also continuing on Imperial Road, with a lane closure and temporary traffic lights causing delays.
Other works in the area:
A217 Wandsworth Bridge Road
25 July — 22 August
Delays likely Traffic control (multi-way signals)
Works description: Arqiva 5G Excavate footway and carriageway to install new duct
Responsibility for works: Cityfibre Metro Networks
A308 Waterford Road
24 July — 28 July
Delays likely Traffic control (multi-way signals)
Works description: Arqiva 5G. Excavate footway and carriageway to install new duct
Responsibility for works:Cityfibre Metro Networks
B317 North End Road
24 July — 21 August
Delays likely Traffic control (multi-way signals)
Works description: Arqiva 5G. Excavate footway and carriageway to install new duct
Responsibility for works: Cityfibre Metro Networks
Stevenage Road
24 July — 03 August
Delays possible Traffic control (two-way signals)
Works description: NEW WATER MAIN EXTENTION TO BE LAID IN C/W
Responsibility for works:Thames Water
Moore Park Road
25 July — 09 August
Delays possible Traffic control (multi-way signals)
Works location: description: Excavate footway and carriageway to install new duct
Responsibility for works: Cityfibre Metro Networks
Oakbury Road
25 July — 09 August
Delays possible Traffic control (multi-way signals)
Works description: Arqiva 5G Excavate footway and carriageway to install new duct
Responsibility for works: Cityfibre Metro Network
A315 Hammersmith Road
25 July — 28 July
Delays possible Some carriageway incursion
Works description: Lead Serv Pipe Relay Sz P Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
July 24, 2018
|