Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
|
A304 Fulham Road, London, Hammersmith and Fulham |
16 November — 28 November |
|
|
Delays likely Lane closure |
|
Works location: A304 |
|
|
Works description: 11/159 TEL0149272 - Signals switched outwhile site is removed Phase 1 - Remove all TfL traffic signals equipment, Excavate and fit sockets for the new signal poles. 2-3 days for reinstatement to cure. 10:00-16:30 Phase 2 - 22 & 23/11/17 - Install new 6m signal poles. 21:00-05:00 no noisy works. Consecutive lane closures for vehicle to park next to works site for the pole install. Pole 2 - lane 1 W/B, pole 1 - contraflow, E/B lane 1 closed, E/B traffic to use W/B lane 2. |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG516S000000003161 |
|
|
|
|
A219 Fulham Palace Road, London, Hammersmith and Fulham |
18 November — 19 November |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: Unknown |
|
|
Works description: INSTALLATION OF TELECOM CHAMBERS AND DUCTS IN THE F/WAY AND C/WAY |
|
|
Responsibility for works: CITY OF LONDON TELECOMMS |
|
|
Current status: Planned work about to start |
|
|
Works reference: CS02017/09/027 |
|
|
|
|
A308 New King's Road, London, Hammersmith and Fulham |
18 November — 19 November |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: Unknown |
|
|
Works description: Service Pipe Repair Fway & in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU301000030941076-003 |
|
|
|
|
A3217 King's Road, London, Kensington and Chelsea |
17 November — 17 November |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: Unknown |
|
|
Works description: 12/049 tel0156739 - slot cut c/w sensor loops to repair traffic signals SD0 plus feed to existing chamber (f/w 2m new duct and underkerb) 10.00-15.00, westbound c/w lane 1 and f/w to chamber (ped access maintained) TM Approved #: A5044 |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG516S000000003201 |
|
|
|
|
|
|
A3218 Lillie Road, London, Hammersmith and Fulham |
17 November — 17 November |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: Unknown |
|
|
Works description: BT need to install the phone box on site. Stop & Go will be installed to allow this to happen. |
|
|
Responsibility for works: Openreach |
|
|
Current status: Planned work about to start |
|
|
Works reference: BC005PL1W0000LOHM0003/02 |
|
|
|
|
Information supplied by roadworks.org
|