Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
A308 New King's Road, London, Hammersmith And Fulham |
27 August — 28 August |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: A308 |
|
|
Works description: This Permit Is For Thames Water, Which Will Involve Carrying Out Interim To Permanent Reinstatement. Works To Take Place In The Carriageway. (2nd Half Of C/W Works) ****Agility**** |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A219 Fulham High Street, London, Hammersmith And Fulham |
26 August — 05 September |
|
|
Delays possible Some carriageway incursion |
|
Works location: A219 |
|
|
Works description: Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Replace A Very Poor Condition Link Box In The Footway. Part Of Hse Initiative To Replace All Identified High Risk Link Boxes. |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
A308 New King'S Road, London, Hammersmith And Fulham |
26 August — 26 August |
|
|
Delays possible Some carriageway incursion |
|
Works location: A308 |
|
|
Works description: To Rectify A Loose And Rocking Slab |
|
|
Responsibility for works: Vodafone Group |
|
|
Current status: Work in progress |
|
|
|
|
A308 New King'S Road, London, Hammersmith And Fulham |
26 August — 26 August |
|
|
Delays possible Some carriageway incursion |
|
Works location: A308 |
|
|
Works description: To Rectify A Loose And Rocking Slab |
|
|
Responsibility for works: Vodafone Group |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
|
|
|
Information supplied by roadworks.org
|