Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
|
A304 Fulham Road, London, Hammersmith And Fulham |
26 July — 27 July |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A304 |
|
|
Works description: Install 10m Of 1 Way Poly Duct In Carriageway,Install 6m Of 1 Way Poly Duct In Footway |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A3218/B304 Old Brompton Road, London, Kensington And Chelsea |
26 July — 28 July |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A3218/B304 |
|
|
Works description: 1x50mm New Water Supply Connection, Footway And In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
26 July — 28 July |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A3218 |
|
|
Works description: New Track Across Ongar Road Junction With A3218 |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
26 July — 28 July |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A3219 |
|
|
Works description: Install 11m Of 1 Way Poly Duct In Carriageway |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
27 July — 28 July |
|
|
Delays likely Road closure |
|
Works location: A3219 |
|
|
Works description: Phase 2- Carriageway Resurfacing |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
Information supplied by roadworks.org
|