Upcoming Roadworks Around Fulham


Traffic delays likely due to lane and road closures in the area

A304 Fulham Road, London, Hammersmith And Fulham

18 June — 19 June

Delays likely Traffic control (two-way signals)

Works location: A304

Works description: This Permit Is For Thames Water, Which Will Involve Carrying Out A New 2x32mm Customer Supply And Connection To The 4" Water Mains, Works In The Footway And Carriageway

Responsibility for works: Thames Water

Current status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

18 June — 19 June

Delays likely Traffic control (two-way signals)

Works location: A3219

Works description: 1x32mm Ne W Water Supply Connection, Footway And In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

B349 Lower Richmond Road, Putney, London, Wandsworth

18 June — 20 June

Delays likely Traffic control (two-way signals)

Works location: B349

Works description: Lay New Service To No. 121 - Excavate In The Nearside Carriageway Maintaining Traffic Flow Using 2 Way Lights As Per Tm Plan, Excavate In The Nearside Footway Maintaining 1.2m For Pedestrians. D+1 Reinstatement Sunday 05/06/2016 - Tm Plan Attached - As Per Site Meeting With Chris Pratt And Scott Richardson

Responsibility for works: SGN

Current status: Planned work about to start

A3218 Lillie Road, London, Hammersmith And Fulham

18 June — 18 June

Delays possible Some carriageway incursion

Works location: A3218

Works description: Reinstate A Type Pillar Box

Responsibility for works: Romec Ltd

Current status: Planned work about to start

A3218 Lillie Road, London, Hammersmith And Fulham

18 June — 21 June

Delays possible Some carriageway incursion

Works location: A3218

Works description: Repair Patch- Remedial Reinstatement In The Footway

Responsibility for works: Virgin Media

Current status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

17 June — 21 June

Delays possible Some carriageway incursion

Works location: A3219

Works description: Service Pipe Reconnect In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

A3219 Munster Road, London, Hammersmith And Fulham

18 June — 19 June

Delays possible Traffic control (priority working)

Works location: A3219

Works description: Install 14m Of 1 Way Poly Duct In Footway,Install 8m Of 1 Way Poly Duct In Carriageway

Responsibility for works: BT

Current status: Planned work about to start

Finborough Road, London, Kensington And Chelsea

17 June — 18 June

Delays possible Some carriageway incursion

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

Tadema Road, London, Kensington And Chelsea

17 June — 18 June

Delays possible Some carriageway incursion

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

Tadema Road, London, Kensington And Chelsea

18 June — 18 June

Delays possible Some carriageway incursion

Works location: -

Works description: -

Responsibility for works: Virgin Media

Current status: Planned work about to start

 

 


Information supplied by roadworks.org

 

 

Related links
Related Links

Roadworks sign

Live Travel News for Fulham