A3218 Lillie Road, London, Hammersmith And Fulham |
16 January — 17 January Traffic control (two-way signals) |
|
|
Delays likely due to Streetworks
Repair To A Damaged Water Main In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A3218 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
15 January — 19 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Boundary Box Exchange In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A304 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
16 January — 20 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement 2016 at A304 |
|
|
Responsibility: UK Power Networks |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3217 King'S Road, London, Kensington And Chelsea |
16 January — 19 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A3217 |
|
|
Responsibility: Virgin Media |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
15 January — 18 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Self Defect Remedial Reinstatement In The Carriageway - Anti Skid Only at A3218 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
15 January — 19 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Install New Outside Stop Valve In Footway at A3219 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
15 January — 19 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Remedial Reinstatement In The Carriageway (Construct A New Manhole O/S 228 In The Carriageway To Install An Anti-Flooding Device To Prevent Internal Sewer Flooding To The Property. A Slip Trench Across The Footpath Is Required For An Electricity Cable Connection To The Property.) at A3219 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
|
|
|
|