Upcoming Roadworks Around Fulham


Traffic delays likely due to lane and road closures in the area

A219 Fulham Palace Road, London, Hammersmith And Fulham

05 January — 11 January Lane closure

Delays likely due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement 2016 at A219

Responsibility: UK Power Networks

EToN status: Planned work about to start

A304 Fulham Road, London, Hammersmith And Fulham

07 January — 08 January Some carriageway incursion

Delays possible due to Streetworks
Installation Of Cctv Street Cabinet Adjacent To Street Lighting Column On Behalf Of Lbhf.. at A304

Responsibility: Hammersmith and Fulham London Borough Council

EToN status: Planned work about to start

A304 Fulham Road, London, Hammersmith And Fulham

07 January — 11 January Some carriageway incursion

Delays possible due to Streetworks
Install 1m Of 1 Way Poly Duct In Footway at A304

Responsibility: BT

EToN status: Planned work about to start

A304 Fulham Road, London, Hammersmith And Fulham

07 January — 11 January Some carriageway incursion

Delays possible due to Streetworks
Install New Outside Stop Valve In Footway at A304

Responsibility: Thames Water

EToN status: Planned work about to start

A308 Waterford Road, London, Hammersmith And Fulham

08 January — 12 January Some carriageway incursion

Delays possible due to Streetworks
Bounday Box Exchange at A308

Responsibility: Thames Water

EToN status: Planned work about to start

A3218 Lillie Road, London, Hammersmith And Fulham

07 January — 11 January Some carriageway incursion

Delays possible due to Streetworks
Connections Small Service:Disconnection: (Approx Depth 450mm):Disconnect Existing Supply at A3218

Responsibility: UK Power Networks

EToN status: Planned work about to start

B317 North End Road, London, Hammersmith And Fulham

07 January — 11 January Some carriageway incursion

Delays possible due to Streetworks
Service Pipe Repair In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at B317

Responsibility: Thames Water

EToN status: Planned work about to start

B349 Lower Richmond Road, Putney, London, Wandsworth

08 January — 12 January Some carriageway incursion

Delays possible due to Streetworks
Install 3m Of 1 Way Poly Duct In Footway at B349

Responsibility: BT

EToN status: Planned work about to start

Greyhound Road, London, Hammersmith And Fulham

08 January — 12 January Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

 

Information supplied by roadworks.org

January 7, 2016

 

 

Related links
Related Links

Roadworks sign

Live Travel News for Fulham