Upcoming Roadworks Around Fulham
Traffic delays likely due to lane and road closures in the area
A217 Wandsworth Bridge Road, London, Hammersmith And Fulham |
25 September — 27 September Traffic control (two-way signals) |
Delays likely due to Streetworks
Digimage To Rectify Consequential Damage Carriageway - Dmt 78396 at A217 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
A308 New King's Road, London, Hammersmith And Fulham |
26 September — 27 September Traffic control (two-way signals) |
Delays likely due to Streetworks
This Permit Is For Thames Water, Which Will Involve Carrying Out Interim To Permanent Reinstatement In The Footway And Carriageway at A308 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
26 September — 27 September Traffic control (two-way signals) |
Delays likely due to Streetworks
Locate A Repair A Buried Network Valve In Carriageway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase at A3218 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
26 September — 27 September Traffic control (two-way signals) |
Delays likely due to Streetworks
Lay 2 Way Duct In C/W (Road Crossing) & Cabinet In Fooway at A3218 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
A308 New King'S Road, London, Hammersmith And Fulham |
25 September — 02 October Some carriageway incursion |
Delays possible due to Streetworks
Bore Hole For Ground Investigations Study & Trial Hole To Confirm No Utility Clash At Borehole Point, Working For Optimise On Behalf Of Thames Water at A308 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
A3217 King'S Road, London, Kensington And Chelsea |
25 September — 28 September Some carriageway incursion |
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A3217 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
|
|
|
|
Information supplied by roadworks.org
|