Roadworks in the Fulham Area
Where to expect traffic delays in the days ahead
A217 Wandsworth Bridge Road, London, Hammersmith And Fulham |
01 August — 02 August Traffic control (two-way signals) |
Delays likely due to Streetworks
This Permit Is For Thames Water, Which Will Involve Carrying Out Remedial Works In The Carriagway As Reported By The Ha at A217 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A219 Fulham Palace Road, London, Hammersmith And Fulham |
31 July — 31 July Lane closure |
Delays likely due to Streetworks
Replace Sewer Cover--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
31 July — 04 August Some carriageway incursion |
Delays possible due to Streetworks
Service Pipe Repair In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A3218 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
31 July — 06 August Some carriageway incursion |
Delays possible due to Streetworks
Lay New Domestic Service 8m From Main In Footway at A3218 |
Responsibility: National Grid Gas Plc |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
Information supplied by roadworks.org
|