Roadworks in the Fulham Area
Where to expect traffic delays in the days ahead
A3218 Lillie Road, London, Hammersmith And Fulham |
20 June — 20 June Traffic control (two-way signals) |
Delays likely due to Streetworks
To Exchange Faulty Pump In Manhole Chamber. No Excavation at A3218 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
B317 North End Road, London, Hammersmith And Fulham |
19 June — 23 June Traffic control (Stop/Go boards) |
Delays likely due to Streetworks
Install 2m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at B317 |
Responsibility: BT |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
A3217 King'S Road, London, Kensington And Chelsea |
19 June — 19 June Some carriageway incursion |
Delays possible due to Streetworks
Mill 100mm And Relay With 60 Mm Ac20 Base And 40mm Of 10mm Fibrovia at A3217 |
Responsibility: Kensington and Chelsea Royal Borough Council |
EToN status: Planned work about to start |
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
19 June — 20 June Some carriageway incursion |
Delays possible due to Streetworks
This Permit Is For Thames Water, Which Will Involve Carrying Out Remedial Works In The Footway As Reported By The Ha *****Elms**** at A3219 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
Information supplied by roadworks.org
|