Roadworks in the Fulham Area
Where to expect traffic delays in the days ahead
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
24 April — 30 April |
Delays likely Lane closure |
Works location: A304 |
Works description: Disconnect 1 X 1" Steel And 1 X 25mm Pe Service From Main In Footway |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
A3219 Dawes Road, London, Hammersmith And Fulham |
25 April — 26 April |
Delays likely Traffic control (two-way signals) |
Works location: A3219 |
Works description: Disconnect A Redundant Water Supply In The Footway And Carriageway Incarriageway. Our Intention Is To Complete The Permanent Reinstatement Inthe Same Phase |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
Townmead Road, London, Hammersmith And Fulham |
24 April — 28 April |
Delays likely Traffic control (Stop/Go boards) |
Works location: - |
Works description: - |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
|
|
|
|
|
Townmead Road, London, Hammersmith And Fulham |
25 April — 26 April |
Delays likely Traffic control (two-way signals) |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
A304 Fulham Road, London, Hammersmith And Fulham |
24 April — 28 April |
Delays possible Some carriageway incursion |
Works location: A304 |
Works description: Remedial Works Following Defect Inspection - To Rectify 2x Fillets In Concrete Fwy With Time Allowed For Curing |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
A3218 Lillie Road, London, Hammersmith And Fulham |
25 April — 26 April |
Delays possible Some carriageway incursion |
Works location: A3218 |
Works description: New Water Supply. This Permit Is On Behalf Of Thames Water. Works Will Be Carried Out F/Way. Two Way Lights To Be Used For Traffic Management. Bus Stop Has Been Suspended For Works To Take Place. |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
Broomhouse Road, London, Hammersmith And Fulham |
24 April — 30 April |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
|
Information supplied by roadworks.org
|