A304 Fulham Road, London, Hammersmith And Fulham |
26 February — 04 March |
Delays possible Some carriageway incursion |
Works location: A304 |
Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 130082 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
A308 King'S Road, London, Hammersmith And Fulham |
26 February — 02 March |
Delays possible Some carriageway incursion |
Works location: A308 |
Works description: Locate And Excavate 1 Blockage In Existing Duct |
Responsibility for works: BT |
Current status: Planned work about to start |
|
A3219 Munster Road, London, Hammersmith And Fulham
|
25 February — 03 March |
Delays possible Some carriageway incursion |
Works location: A3219 |
Works description: Alter And Relay Domestic Service 4m From Main In Carriageway |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
B317 North End Road, London, Hammersmith And Fulham |
26 February — 02 March |
Delays possible Some carriageway incursion |
Works location: B317 |
Works description: Blocked Duct In Footway |
Responsibility for works: Virgin Media |
Current status: Planned work about to start |
|
|
B349 Lower Richmond Road, Putney, London, Wandsworth |
25 February — 27 February |
Delays possible Some carriageway incursion |
Works location: B349 |
Works description: Connections Small Service:New Individual Supply::Excavate And Expose Mains Cable For Installation Of A New 100amp 3ph Service |
Responsibility for works: UK Power Networks |
Current status: Planned work about to start |
|
|
Breer Street, London, Hammersmith And Fulham |
25 February — 27 February |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: Thames Water |
Current status: Planned work about to start |
|
|
Finborough Road, London, Kensington And Chelsea |
25 February — 02 March |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
|
Imperial Road, London, Hammersmith And Fulham |
25 February — 27 February |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: BT |
Current status: Planned work about to start |
|
|
Peterborough Road, London, Hammersmith And Fulham |
26 February — 02 March |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: National Grid Gas Plc |
Current status: Planned work about to start |
|
|
Redcliffe Gardens, London, Kensington And Chelsea |
25 February — 26 February |
Delays possible Some carriageway incursion |
Works location: - |
Works description: - |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
Information supplied by roadworks.org
|