A217 Wandsworth Bridge Road, London, Hammersmith And Fulham
06 October — 17 October
Delays likely Traffic control (multi-way signals)
Works location: A217
Works description: Connections Projects:New Individual Supply::Excavate Joint Hole For Lv Service Joint Pull 10m Of 95mmwv
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A308/A304 Fulham Road, London, Kensington And Chelsea
06 October — 10 October
Delays likely Traffic control (multi-way signals)
Works location: A308/A304
Works description: Exc In Cw To Repair Blocked Gully
Responsibility for works: Kensington and Chelsea Royal Borough Council
Current status: Planned work about to start
Embankment, Putney, London, Wandsworth
05 October — 05 October
Delays likely Road closure
Works location: -
Works description: -
Responsibility for works: Wandsworth London Borough Council
Current status: Advanced planning
A308 New King'S Road, London, Hammersmith And Fulham
06 October — 17 October
Delays possible Some carriageway incursion
Works location: A308
Works description: Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 130943 - C - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours.
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
06 October — 09 October
Delays possible Some carriageway incursion
Works location: A3218
Works description: 4x25mm Mdpe Connection Plots 1-4 New Water Supply Connection In Footway.Our Intention Is To Complete The Permanent Reinstatement In The Samephase
Responsibility for works: Thames Water
Current status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
06 October — 17 October
Delays possible Some carriageway incursion
Works location: A3218
Works description: Lay Duct In Footway
Responsibility for works: Virgin Media
Current status: Planned work about to start
A3219 Munster Road, London, Hammersmith And Fulham
06 October — 08 October
Delays possible Some carriageway incursion
Works location: A3219
Works description: Remedial Works In Footway. Replace Fillet Around A Box In Footway.
Responsibility for works: Thames Water
Current status: Planned work about to start
Filmer Road, London, Hammersmith And Fulham
06 October — 08 October
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Mulgrave Road, London, Hammersmith And Fulham
06 October — 17 October
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Virgin Media
Current status: Planned work about to start
 
 